OUR PROJECTS

OUR PROJECTS

Ehoko Urban

District

Adolar worked on a social project promoted by the Government of Guinea Equatorial with the aim of improving the living conditions of citizens, providing them with access to basic and administrative services.

Riaba

Adolar contributed to a hydraulic project initiated by the Government of Equatorial Guinea, aimed at enhancing the quality of life for citizens by improving access to reliable water resources and sanitation services. The project focuses on ensuring sustainable water management

Renewable energy

Operating projects

 

Van Kleef

Location: Njoro

Capacity: 125.28kWp

Solar Supply: 40%+ of client consumption

Type: Grid-Tie

Mounting: Roof

Sosiani Flowers

Location: Eldoret

Capacity: 129kWp

Solar Supply: 40%+ of client consumption

Type: Grid-Tie

Mounting: Ground

Hannah Roses

Location: Thika

Capacity: 108kWp

Solar Supply: 40%+ of client consumption

Type: Grid-Tie

Mounting: Roof

Big flower timau

Location: Meru

Capacity: 65kWp

Solar Supply: 40%+ of client consumption

Type: Grid-Tie

Mounting: Ground

Kevian Industries

Location: Thika

Capacity: 664kWp

Solar Supply: 40%+ of client consumption

Type: Grid-Tie

Mounting: Roof

Under construction

Andom Bokuen

Total surface area: 14 hectares

Population: 500 people

Solar systems: 900KWh/600KWp

Storage capacity: 1088 kwh

Angonowein

Total surface area: 10 hectares

Population: 700 people

Solar systems: 750KWh/500KWp

Storage capacity: 1147 kwh

Bibara Onvang

Total surface area: 6 hectares

Population: 900 people

Solar systems: 850KWh/600KWp

Storage capacity: 1050 kwp

Evodulu

Total surface area: 3 hectares

Population: 600 people

Solar systems: 900KWh/600KWp

Storage capacity: 1135 kwh

Kukumankuak

Total surface area: 32 hectares

Population: 1400 people

Solar systems: 1088KWh/737KWp

Storage capacity: 1345 kwh

Akok Esabok

Total surface area: 16 hectares

Population: 500 people

Solar systems: 968KWh/650KWp

Storage capacity: 1147 kwh